Lougher Viaduct near Swansea. 220m long rail bridge across the estuary. Demolished within 100 hours. 24 hour working, 40 site operatives on each 12 hour shift.
You must be logged in to post a comment.
Your Name (required)
Your Email (required)
Subject
Message
Please tick this box to opt-in to receive emails from us Yes